Power System Utilization

Reserve Margin

RM\% = ((Available\ Capacity - Peak\ Demand) / Peak\ Demand) \times 100

Variables

RM% Reserve margin %
Available Total available generation capacity MW
Peak System peak demand MW
Open Reserve Margin Calculator →

Engineering Example

A system with 1500 MW available against a 1200 MW peak: RM = (1500−1200)/1200×100 = 25%.

Practical Site Example

Nepal's grid has swung between a dry-season import need and a wet-season exportable surplus — this metric quantifies that gap.