EE Pro
Power System Utilization

Levelized Cost per Unit Generated

Cost_{kWh} = Total\ Annual\ Cost / Annual\ Energy\ Generated
Variables
Cost/kWh Cost per unit generated currency/kWh
TotalCost Total annual operating + financing cost currency
AEG Annual energy generated kWh
Engineering Example

A plant with annual cost of 50,000,000 and AEG of 5,913,000 kWh: Cost/kWh ≈ 8.46 per kWh.

Practical Site Example

The simplified version of the levelized cost of energy (LCOE) used in early-stage hydropower feasibility comparisons.